The Ethio-Djibouti Railway was established in April 2017 following a bilateral agreement signed on December 16, 2016, between Ethiopia and Djibouti. A Shareholders Agreement was signed on January 11, 2017, among public bodies and state enterprises from both nations, governed by Ethiopian commercial law.
The shareholders formed a Share Company with an initial capital of USD 500 million, dedicated to operating and maintaining the Addis Ababa–Djibouti Railway and providing freight and passenger transport services. The Ethiopian Railway Corporation (ERC) holds a 72% share, while the Société Djiboutienne de Chemin de Fer (SDCF) owns 25%. The remaining shares are divided among the Ministry of Transport (MoTL), the Ministry of Finance (MoF), and the former Ministry of Public Enterprises (MoPE), each holding 1%.
The railway line begins in Sebeta, southwest of Addis Ababa, and runs east through Adama, Mieso, Diredawa, and the border station Dewanle, ultimately reaching the ports of Djibouti. The total length of the railway is 756 km, featuring double tracks from Sebeta to Adama and single track from Adama to the Djibouti ports.
There are 20 stations along the route, with a dispatching command center located in Labu and a sub-center in Nagad. Locomotive and rolling stock depots, as well as facilities for train inspection and repair, have been established in Indode, while Nagad also features a locomotive turnback depot and repair facility.
Operational and maintenance activities commenced in January 2018 by hiring a Management Contractor for six years: having contractual responsibility of maintaining & operating the railway line and providing capacity building trainings for the local staff, Ethiopian and Djiboutian, to handover the work at the end of the Management contract period. Accordingly, the Management Contractor has operated and maintained the line from 2018 to end of 2023 and officially handed over the work to the local staff since January 1, 2024.
Accordingly, the local staff handled all operation and maintenance undertakings in the 2024 fiscal year with a close follow-up from the Board of Directors.
Vision
To become the top logistics choice in the corridor by 2027
Mission
Provide reliable, efficient and profitable railway transport service to support the development of both Countries